Infrastructure & Economic Growth
New Test Well
The planned test well will be located at 207 E. 38th St and should be in construction phase prior to May 9, 2025. The test well will provide critical details (anticipated flows, water quality, etc.) which will be used to determine the exact location and depth of a new production well, which will also be located at 207 E. 38th Street. The output from this well is expected to be around 1,500 gpm and will supply potable water to the area located between East/West 30th Street to East/West 42nd Street. Since Garden City’s grade runs downhill with the Boise River, the impact of this well is expected to be seen throughout Garden City.